For the first time in Sichuan Province, China, robots were used to clear ice accumulation on power lines, with the robots clearing a 500-meter section of the power line in just 15 minutes.

中國四川省首次使用機器人清理輸電線路上的積冰,機器人在短短15分鐘內(nèi)清理了500米長的一段電力線路。